PBBM To Filipinos Abroad: Exercise Your Right, Avail Of Online Voting

Ang mga Pilipinong nasa ibang bansa ay hinikayat ni Pangulong Marcos na gamitin ang kanilang karapatan sa pagboto sa pamamagitan ng Online Voting System.

DTI Chief: First Quarter GDP Growth Shows Resilient Philippine Economy

Ayon sa DTI, ang paglago ng GDP sa unang kwarter ng 2025 ay patunay ng katatagan ng ekonomiya ng Pilipinas sa harap ng mga pagsubok.

DAR Distributes PHP8.2 Million Equipment To Bukidnon Farmers’ Groups

DAR namahagi ng PHP8.2 milyong kagamitan sa 15 agrarian reform beneficiary organizations sa Bukidnon, pinatatag ang sektor ng agrikultura.

Iloilo City Launches 1st LGU-Led Nutrition Hub For Kids, Moms

Iloilo City inilunsad ang unang LGU-led Nutrition Hub para sa mga bata at mga ina. Ang Uswag Nutrition Center ay naglalayong magbigay ng masustansyang pagkain para sa lahat.

TPLEX Extension To Boost Growth In Northern Luzon

Approval of the PHP23.4-billion Tarlac-Pangasinan-La Union Expressway extension project to drive economic development in Northern Luzon, cutting travel time significantly.


TPLEX Extension To Boost Growth In Northern Luzon

15
15

How do you feel about this story?

Like
Love
Haha
Wow
Sad
Angry

The approval of the PHP23.4-billion 59.4-kilometer Tarlac-Pangasinan-La Union Expressway (TPLEX) extension project will further spur economic development in Northern Luzon, the Department of Finance (DOF) said.

“The TPLEX Extension Project’s swift approval demonstrates the President Ferdinand R. Marcos Jr. administration’s resolve to cut bureaucratic red tape and streamline government processes. This is critical to accelerating much-needed investments in infrastructure,” Finance Secretary Benjamin Diokno said in a statement over the weekend.

The National Economic and Development Authority (NEDA) Board chaired by President Marcos approved on Friday the TPLEX extension project.

The evaluation and approval process for the project is the fastest recorded for a public-private partnership (PPP) proposal.

The proposal was submitted to the Investment Coordination Committee on March 23 and subsequently elevated to the NEDA Board.

The NEDA Board gave the Department of Public Works and Highways permission to commence negotiations with the project’s original proponent.

To ensure a thorough and fair evaluation process, the DOF introduced provisions to the parameters, terms, and conditions to limit government contingent liabilities in case of concessionaire default.

The TPLEX extension project is expected to cut the travel time from Rosario to San Juan, La Union province from 96 minutes to 42 minutes.

The first segment spanning Rosario to Tubao is estimated to be operational by 2026, while the entire project is to be completed by 2028.

“The government is committed to strengthening and facilitating PPPs. This requires a well-functioning and responsive policy framework, underpinned by transparency and accountability,” Diokno said.

The 89.31-kilometer TPLEX that spans Tarlac City, Tarlac to Rosario, La Union was completed in 2020. (PNA)