iWantTFC To Stream ‘Meteor Garden’ Exclusively 48 Hours Before Its TV Broadcast

Revisit the magic of the early 2000s as we bring back the beloved “Meteor Garden” exclusively on iWantTFC.

Ayala Malls Cinemas Honors Awards Season With Acclaimed Film ‘The Brutalist’

Experience the brilliance of The Brutalist, an Oscar contender, only at Ayala Malls Cinemas.

Philippine Dry Season Guide: Staying Safe And Hydrated In Hot Weather

As the sun blazes overhead, it’s time to prepare for rising temperatures and make smart choices to stay cool and healthy.

DPWH: Multi-Million Projects In Davao Del Norte To Be Completed By ’26-27

Target ng DPWH na tapusin ang mga proyekto sa Davao del Norte sa 2026 at 2027. Handa na ang Davao sa pagbabago.

LWUA To Help Improve Services Of Cagayan De Oro Water Utility

Ang LWUA ay nakatuon sa pagpapabuti ng serbisyo ng Cagayan de Oro Water District. Tunay na hakbang tungo sa mas magandang saklaw ng tubig.
By The Philippine Post

LWUA To Help Improve Services Of Cagayan De Oro Water Utility

2097
2097

How do you feel about this story?

Like
Love
Haha
Wow
Sad
Angry

The Local Water Utilities Administration (LWUA) is prioritizing the resolution of an estimated PHP337 million worth of materials and Non-Revenue Water (NRW) projects to improve the operations of the Cagayan de Oro Water District (COWD).

During the Cagayan de Oro Press Club’s “Meet the Press” program Wednesday, Interim Manager Fermin Jarales outlined LWUA’s nine-point action plan for COWD.

The plan includes auditing PHP153 million worth of materials for water maintenance and operation through a Materials Utilization Report, with planning set for January to April 2025 and implementation from May to December 2025.

“LWUA intervened to eliminate the threat of water shortages. We aim to ensure uninterrupted water supply in Cagayan de Oro,” Jarales said.

Additionally, PHP225 million has been allocated for the NRW Program, which will feature a system-wide management strategy.

Planning for the program is expected by March 2025, with implementation details to follow.

Jarales emphasized that the nine-point plan focuses on past-due account collection, NRW reduction, and cost-cutting measures, aligning with a five-year development plan.

Since LWUA assumed control of COWD in May 2024, PHP9.78 million has been recovered from delinquent accounts. (PNA)