PBBM Orders Continued OFW Repatriation, Speedy Aid Amid Mideast Crisis

Inatasan ni Pangulong Marcos ang patuloy na repatriation ng OFWs at agarang pagbibigay ng tulong sa gitna ng tensyon sa Middle East.

BIR-CAR Eyes Boost In Tax Collection Via ‘CHAT’, Remittances

Umaasa ang BIR-CAR na mapapalakas ang tax collection sa pamamagitan ng remittances at paggamit ng ‘CHAT’ initiatives.

National Museum Launches Archaeological Survey In Northern Samar

Naglunsad ang National Museum ng archaeological survey sa Northern Samar upang tuklasin ang kasaysayan at mga sinaunang artifact sa rehiyon.

PhilHealth Expands Access In Davao Del Norte, Launches Orthopedic Care Package

Mas pinapalawak ng PhilHealth ang access sa orthopedic care sa Davao del Norte sa pamamagitan ng bagong Z Benefits package.

Northern Mindanao Renewable Energy Firm Eyes Agus Hydro Plant Rehab

Isang kumpanya sa Northern Mindanao ang nag-propose ng rehabilitasyon sa Agus hydroelectric plants kasama ang suporta ng gobyerno.

Northern Mindanao Renewable Energy Firm Eyes Agus Hydro Plant Rehab

1545
1545

How do you feel about this story?

Like
Love
Haha
Wow
Sad
Angry

A Northern Mindanao-based renewable energy firm has partnered with government institutions to propose the rehabilitation and refurbishment of the six Agus hydroelectric plants in Mindanao.

In an interview on Wednesday, Cerael Donggay, chief executive officer and president of Greenergy, said the initiative is part of a long-term plan to introduce renewable energy operations under a Rehabilitate–Operate–Maintain (ROM) model.

“To implement this project, we will have to rehabilitate and modernize the Agus plants, implementing flood prevention measures to optimize lake discharges,” Donggay said.

The proposal is currently under review by the Public-Private Partnership Center. The Power Sector Assets and Liabilities Management (PSALM) is also bidding out a requirement for a Third-Party Technical Advisor for the project.

Donggay added that during the rehabilitation phase, they plan to introduce the Hybrid Economic Dispatch (HED) system.

This system, he said, would replace expensive fossil fuel-based diesel peaking plants and coal plants while further increasing the Energy Storage Project’s (ESP) storage capacity.

The HED system was conceptualized by Greenergy in collaboration with the University of Science and Technology of Southern Philippines and other engineering professionals.

The ESP aims to accelerate the transition from fossil fuels to renewable energy, enhance energy security, deliver cost-effective electricity, and provide reliable and efficient energy solutions through the integration of solar and hydropower.

The proposal estimates a 10-year rehabilitation phase, with HED to be applied midway, after five years. (PNA)