Sipalay Accommodations 90% Booked For Holy Week Break

Sipalay, pangunahing beach destination sa Negros Occidental, ay halos puno na ang mga akomodasyon para sa Holy Week.

Malaybalay City’s PHP20 Million IP Housing Project Nears Final Phase

Ang PHP20 milyong proyekto ng pabahay para sa mga katutubo sa Malaybalay City ay malapit nang matapos, may mga susunod na proyekto na nakaplano.

Quezon City Urges Schools To Adopt Sustainable Practices Amid Climate Crisis

Quezon City hinihimok ang mga paaralan na gawing bahagi ng kanilang araw-araw na gawain ang mga sustainable na praktis kasabay ng paglala ng panganib ng pagbabago ng klima.

Negros Occidental Braces For Thousands At Holy Week Pilgrimage Sites

Ang mga pilgrim sites sa Negros Occidental ay handang-handa na para sa pagdagsa ng mga deboto sa panahon ng Mahal na Araw.

LRT-2 To Implement Limited Trips Next Week

LRT-2 To Implement Limited Trips Next Week

9
9

How do you feel about this story?

Like
Love
Haha
Wow
Sad
Angry

The Light Rail Transit Line 2 (LRT-2) announced on Friday the possibility of implementing limited operations from Cubao to Recto and back anytime next week.

LRTA administrator Reynaldo Berroya said this was due to the severe damage of the two rectifier substations.

“Test runs and safety checks of all equipment and facilities such as signaling, communications, power and trains should be completed before we can partially operate,” Berroya said.

However, the operations from Santolan to Anonas and back will still be unavailable at a maximum of nine months as the replacement of the damaged rectifier substations necessitates a highly-technical intervention.

Its replacement needs to undergo the processes of procurement, delivery, installation, testing and commissioning which will take ample time to complete.

Berroya said the cause of the incident is still being investigated and commissioning engineers from the United States involved in the design and installation of the existing rectifier substations will arrive to help in the ongoing probe.

With the operations from Santolan to Anonas still temporarily suspended, buses from the Metropolitan Manila Development Authority (MMDA) and the Philippine Coast Guard are deployed to ferry the affected passengers during peak hours.

Meanwhile, coordination with the Department of Transportation (DOTr), MMDA and Land Transportation Franchising and Regulatory Board (LTFRB) were done to temporarily allow buses and AUV’s to ply an out-of-line route at the stations where operations are still suspended.

The initial estimated damages cost of the system is about PHP428 million.

Berroya thanked the DOTr and various government agencies such as the Bureau of Fire Protection, Philippine Coast Guard, MMDA and LTFRB, after the incident.

He also appeals for understanding and patience from the riding public and assured that LRTA will exhaust all efforts to fast-track the repair and upgrade of the system as several modernization and rehabilitation projects are underway. (PNA)