Sipalay Accommodations 90% Booked For Holy Week Break

Sipalay, pangunahing beach destination sa Negros Occidental, ay halos puno na ang mga akomodasyon para sa Holy Week.

Malaybalay City’s PHP20 Million IP Housing Project Nears Final Phase

Ang PHP20 milyong proyekto ng pabahay para sa mga katutubo sa Malaybalay City ay malapit nang matapos, may mga susunod na proyekto na nakaplano.

Quezon City Urges Schools To Adopt Sustainable Practices Amid Climate Crisis

Quezon City hinihimok ang mga paaralan na gawing bahagi ng kanilang araw-araw na gawain ang mga sustainable na praktis kasabay ng paglala ng panganib ng pagbabago ng klima.

Negros Occidental Braces For Thousands At Holy Week Pilgrimage Sites

Ang mga pilgrim sites sa Negros Occidental ay handang-handa na para sa pagdagsa ng mga deboto sa panahon ng Mahal na Araw.

MRT-3’s Record Ridership Continues In 3rd Month Of Free Ride

The Metro Rail Transit Line 3 continues to log record-high daily ridership in June, the third month of its “libreng sakay” program.

MRT-3’s Record Ridership Continues In 3rd Month Of Free Ride

12
12

How do you feel about this story?

Like
Love
Haha
Wow
Sad
Angry

The Metro Rail Transit Line 3 (MRT-3) continues to log record-high daily ridership in June, the third month of its “libreng sakay (free ride)” program.

In a Facebook post on Thursday, the rail line said a total of 370,713 passengers were served on Wednesday — breaking Tuesday’s record of 370,276 since it resumed operations in June 2020 amid the coronavirus pandemic.

“Ito ay resulta ng pagpapatupad ng libreng sakay ng MRT-3 at pagpapatakbo ng mas maraming train sets, na binubuo ng nasa 14 hanggang 16 3-car CKD train sets, at apat na four-car CKD train sets (This is the result of the free rides at MRT-3 and having more train sets running, made up of 14 to 16 three-car CKD train sets and four four-car CKD train sets),” it said.

Wednesday’s ridership made 10 straight weekdays where the MRT-3 served over 350,000 passengers.

“Matatandaan na nasa 250,000 hanggang 300,000 mga pasahero ang sumasakay sa MRT-3 kada araw bago magsimula ang pandemya noong Marso 2020 (It may be recalled that around 250,000 to 300,000 passengers took a ride at the MRT-3 daily before the beginning of the pandemic in March 2020),” it said.

Earlier, it highlighted that there had been zero unloading incidents or train breakdowns at the MRT-3 since July 16, 2020, due to its “massive” rehabilitation.

Before President Rodrigo Duterte assumed office in 2016, unloading incidents and breakdowns of MRT-3 trains were common but have decreased over time — with 586 unloading incidents in 2016, 463 in 2017, 57 in 2018, 28 in 2019, and zero incidents since 2020.

The free ride program at the MRT-3 began in March and has since been extended repeatedly, with the program set to end on June 30. (PNA)