PBBM To Filipinos Abroad: Exercise Your Right, Avail Of Online Voting

Ang mga Pilipinong nasa ibang bansa ay hinikayat ni Pangulong Marcos na gamitin ang kanilang karapatan sa pagboto sa pamamagitan ng Online Voting System.

DTI Chief: First Quarter GDP Growth Shows Resilient Philippine Economy

Ayon sa DTI, ang paglago ng GDP sa unang kwarter ng 2025 ay patunay ng katatagan ng ekonomiya ng Pilipinas sa harap ng mga pagsubok.

DAR Distributes PHP8.2 Million Equipment To Bukidnon Farmers’ Groups

DAR namahagi ng PHP8.2 milyong kagamitan sa 15 agrarian reform beneficiary organizations sa Bukidnon, pinatatag ang sektor ng agrikultura.

Iloilo City Launches 1st LGU-Led Nutrition Hub For Kids, Moms

Iloilo City inilunsad ang unang LGU-led Nutrition Hub para sa mga bata at mga ina. Ang Uswag Nutrition Center ay naglalayong magbigay ng masustansyang pagkain para sa lahat.

Bacolod City Launches PHP160 Million Comprehensive Waste Management Project

Bacolod City naglunsad ng PHP160 million na Comprehensive Waste Management Project. Isang makabagong Recovery and Recycling Complex at Ecopark ang itatayo sa Barangay Felisa.

Bacolod City Launches PHP160 Million Comprehensive Waste Management Project

2385
2385

How do you feel about this story?

Like
Love
Haha
Wow
Sad
Angry

The city government here broke ground for the construction of the PHP160-million Recovery and Recycling Complex and Ecopark in Barangay Felisa on Wednesday.

Located on a 33.13-hectare site adjacent to the city’s sanitary landfill, the pioneering project is seen to address the growing local waste management challenges through innovative and sustainable solutions.

Mayor Alfredo Abelardo Benitez, who led the groundbreaking ceremony with Lone District Rep. Greg Gasataya and other city officials, said the project will improve solid waste management, create opportunities for recycling, and provide a space that promotes environmental awareness and education.

“Our vision for a cleaner, greener, and more sustainable Bacolod is finally coming to life. Today, we take the first step toward making it a reality with the groundbreaking of the Recovery and Recycling Center and Ecopark,” he said in his message.

Phase 1, expected to be completed within a year, consists of three key components: construction and site development of the materials recovery facility (MRF); supply and installation of facilities and equipment; and implementation of electrical and lighting systems.

The facilities and equipment will include a conveyor belt sorting line, integrated waste solutions in MRF operations, baling of recyclables, tree trimming and yard waste disposal for recycling, and windrow composting.

“Once completed, this facility will serve as a model for sustainable waste management and environmental responsibility in the region, setting a new standard for efficient waste processing and circular economy initiatives,” the project profile stated.

It added “the project seeks to maximize the recovery of recyclable materials, reduce landfill waste, and ensure the proper processing and recycling of recovered resources.”

Ma. Fe Trespuentes, head of Bacolod Environment and Natural Resources Office, said that based on their waste analysis and characterization study, this highly-urbanized city generates an average 577 tons of garbage a day.

Of the total, about 400 tons of garbage enter the sanitary landfill on a daily basis, she said.

Edmond Maceda, the city’s special adviser for solid waste management and sustainability program, described the Recovery and Recycling Complex and Ecopark project as a “true game changer”.

“We are changing the game from collect and dump in Felisa to collect, divert, process, recover, reuse and recycle. It connects three things –environmental protection, social responsibility and economic prosperity,” he said. (PNA)