Sipalay Accommodations 90% Booked For Holy Week Break

Sipalay, pangunahing beach destination sa Negros Occidental, ay halos puno na ang mga akomodasyon para sa Holy Week.

Malaybalay City’s PHP20 Million IP Housing Project Nears Final Phase

Ang PHP20 milyong proyekto ng pabahay para sa mga katutubo sa Malaybalay City ay malapit nang matapos, may mga susunod na proyekto na nakaplano.

Quezon City Urges Schools To Adopt Sustainable Practices Amid Climate Crisis

Quezon City hinihimok ang mga paaralan na gawing bahagi ng kanilang araw-araw na gawain ang mga sustainable na praktis kasabay ng paglala ng panganib ng pagbabago ng klima.

Negros Occidental Braces For Thousands At Holy Week Pilgrimage Sites

Ang mga pilgrim sites sa Negros Occidental ay handang-handa na para sa pagdagsa ng mga deboto sa panahon ng Mahal na Araw.

Bacolod City Launches PHP160 Million Comprehensive Waste Management Project

Bacolod City naglunsad ng PHP160 million na Comprehensive Waste Management Project. Isang makabagong Recovery and Recycling Complex at Ecopark ang itatayo sa Barangay Felisa.

Bacolod City Launches PHP160 Million Comprehensive Waste Management Project

2385
2385

How do you feel about this story?

Like
Love
Haha
Wow
Sad
Angry

The city government here broke ground for the construction of the PHP160-million Recovery and Recycling Complex and Ecopark in Barangay Felisa on Wednesday.

Located on a 33.13-hectare site adjacent to the city’s sanitary landfill, the pioneering project is seen to address the growing local waste management challenges through innovative and sustainable solutions.

Mayor Alfredo Abelardo Benitez, who led the groundbreaking ceremony with Lone District Rep. Greg Gasataya and other city officials, said the project will improve solid waste management, create opportunities for recycling, and provide a space that promotes environmental awareness and education.

“Our vision for a cleaner, greener, and more sustainable Bacolod is finally coming to life. Today, we take the first step toward making it a reality with the groundbreaking of the Recovery and Recycling Center and Ecopark,” he said in his message.

Phase 1, expected to be completed within a year, consists of three key components: construction and site development of the materials recovery facility (MRF); supply and installation of facilities and equipment; and implementation of electrical and lighting systems.

The facilities and equipment will include a conveyor belt sorting line, integrated waste solutions in MRF operations, baling of recyclables, tree trimming and yard waste disposal for recycling, and windrow composting.

“Once completed, this facility will serve as a model for sustainable waste management and environmental responsibility in the region, setting a new standard for efficient waste processing and circular economy initiatives,” the project profile stated.

It added “the project seeks to maximize the recovery of recyclable materials, reduce landfill waste, and ensure the proper processing and recycling of recovered resources.”

Ma. Fe Trespuentes, head of Bacolod Environment and Natural Resources Office, said that based on their waste analysis and characterization study, this highly-urbanized city generates an average 577 tons of garbage a day.

Of the total, about 400 tons of garbage enter the sanitary landfill on a daily basis, she said.

Edmond Maceda, the city’s special adviser for solid waste management and sustainability program, described the Recovery and Recycling Complex and Ecopark project as a “true game changer”.

“We are changing the game from collect and dump in Felisa to collect, divert, process, recover, reuse and recycle. It connects three things –environmental protection, social responsibility and economic prosperity,” he said. (PNA)