PBBM To Filipinos Abroad: Exercise Your Right, Avail Of Online Voting

Ang mga Pilipinong nasa ibang bansa ay hinikayat ni Pangulong Marcos na gamitin ang kanilang karapatan sa pagboto sa pamamagitan ng Online Voting System.

DTI Chief: First Quarter GDP Growth Shows Resilient Philippine Economy

Ayon sa DTI, ang paglago ng GDP sa unang kwarter ng 2025 ay patunay ng katatagan ng ekonomiya ng Pilipinas sa harap ng mga pagsubok.

DAR Distributes PHP8.2 Million Equipment To Bukidnon Farmers’ Groups

DAR namahagi ng PHP8.2 milyong kagamitan sa 15 agrarian reform beneficiary organizations sa Bukidnon, pinatatag ang sektor ng agrikultura.

Iloilo City Launches 1st LGU-Led Nutrition Hub For Kids, Moms

Iloilo City inilunsad ang unang LGU-led Nutrition Hub para sa mga bata at mga ina. Ang Uswag Nutrition Center ay naglalayong magbigay ng masustansyang pagkain para sa lahat.

Berong Nickel Exceeds Mine Rehab Targets For 1H 2023

Berong Nickel Corporation surpasses targets, transforming a depleted mine into an eco-friendly haven for tourism and sustainable development.


Berong Nickel Exceeds Mine Rehab Targets For 1H 2023

6
6

How do you feel about this story?

Like
Love
Haha
Wow
Sad
Angry

Berong Nickel Corporation (BNC) on Thursday reported that it has so far rehabilitated 30 hectares of the Berong mine in Quezon, Palawan in the first half of the year.

In a disclosure to the stock exchange, parent company DMCI Holdings Inc. said the rehabilitated area is equivalent to 88 percent of the company’s 34 hectares target for 2023.

“We are fully committed to addressing our impacts on the environment and to our host communities. In our first year, we were able to exceed many of our rehabilitation targets,” BNC president Tulsi Das Reyes said.

“The progress we have made in such a short time is a testament to our team’s hard work and dedication,” he added.

BNC said it has installed 672 coconets for erosion control and soil stabilization, and laid down 1,721 meters of geo-textiles to enhance the ecological stability of the areas under rehabilitation.

To fast-track the final mine rehabilitation of Berong, BNC produced 214,052 seedlings, 152 percent higher than its target of 85,000, and has planted 81,709 or 96 percent of its annual target of 85,000 seedlings.

The Berong mine opened in October 2006 and was fully depleted by December 2021.

To be conducted over a six-year period starting June 2022, the Berong final rehabilitation program covers 109 hectares of surface mine, 209 hectares of silt control structures and 25 hectares of stockpile area.

BNC said after rehabilitation, the disturbed areas could be used for eco-tourism, agro-forestry and inland fish farming by the Department of Environment and Natural Resources, local government units and host communities. (PNA)