President Marcos’ Easter Sunday Message: Rise In Action, Make A Difference

Sa kanyang mensahe sa Pasko ng Muling Pagkabuhay, hinikayat ni Pangulong Marcos ang mga Pilipino na kumilos sa ngalan ng malasakit at pagkakaisa.

Over PHP605 Million Supplemental Budget Boosts Iloilo City’s Infra

Ipinasa ng Iloilo City Council ang Supplemental Budget No. 1 na nagkakahalaga ng PHP605.3 milyon para sa imprastruktura at pag-aayos ng sahod ng mga regular na empleyado.

Ilocos Norte Cites New Road Trip Destinations

Ilocos Norte ipinakilala ang bagong mga destinasyon para sa road trip ngayong tag-init. Perfect para sa mga mahilig sa road trip.

Iloilo City Institutionalizes Feeding Program For Daycare Learners

Iloilo City ay nagpatupad ng programang pagpapakain para sa mga daycare learners, na may paunang pondo na PHP22 milyon, nangangalaga sa kalusugan ng mga bata.

DOE Exec Sees Normalization Of Luzon Power Supply

DOE Exec Sees Normalization Of Luzon Power Supply

0
0

How do you feel about this story?

Like
Love
Haha
Wow
Sad
Angry

Energy Undersecretary, Felix William Fuentebella has discounted another yellow alert status for the Luzon grid on Wednesday, as maintenance works on the Malampaya gas field in offshore Palawan is expected to end Tuesday.

“We don’t see any yellow alert status for tomorrow because of the additional 1,620 MW (megawatts) from the natural gas plants,” he told journalists in a Viber message Tuesday.

“We expect the completion of Malampaya maintenance today, 15 October 2019. Once gas supply is available, Ilijan Blocks A and B (2 x 600MW) and San Gabriel (420 MW) will be operation starting tomorrow,” he added.

The Malampaya gas field was on maintenance shutdown since October 12, 2019.

Yellow alert was again raised in the Luzon grid on Monday due to large power supply deficiency partly due to the Malampaya maintenance shutdown.

Forced outage for the day affected capacity reaching 1,163 megawatts (MW) based on the total installed capacity of five power plants that include the Sual coal-fired power plant.

Team Energy Corporation’s (TEC) 647 MWs have been on forced outage due to condenser tube leak since last October 11.

Fuentebella said “Sual Unit 1, as per their report yesterday, (said) they are targeting to complete the repair and ‘washing’ of turbine by 21 or 22 October 2019.”

“PMS (preventive maintenance schedule) of Sual Unit 2, which is scheduled to start on 19 October 2019 and end on 17 November 2019, will be moved until Unit 1 is available and stable,” he added. (PNA)