PBBM Orders Agencies To Promptly Pay Performing Contractors

Iniutos ni PBBM ang mabilis na pagbayad sa mga performing contractors bilang bahagi ng pagpapaayos ng government processes.

New Davao Project To Boost Community Disaster Resilience

Nakatakdang simulan ng DSWD-11 ang isang five-year resilience project na tutok sa kahandaan ng komunidad sa sakuna.

Negrense Cops, Dependents Avail Of One-Stop-Shop Frontline Services

Nakapag-avail ng iba’t ibang frontline services ang higit 600 police personnel at pamilya sa isang one-stop-shop activity sa Negros.

Ilocos Norte Farmers, Fishers Get PHP95 Million Aid On Founding Day

Tumulong ang Ilocos Norte sa mga magsasaka at mangingisda sa pamamagitan ng PHP95 milyong assistance sa araw ng pagkakatatag ng lalawigan.

Iloilo Town Inaugurates Solar-Powered Municipal Building

May bagong gusali ang Miagao na pinapagana ng solar energy, na nagkakahalaga ng PHP180 milyon. Layunin nitong pagandahin ang serbisyo at bawasan ang energy costs.

Iloilo Town Inaugurates Solar-Powered Municipal Building

360
360

How do you feel about this story?

Like
Love
Haha
Wow
Sad
Angry

The municipality of Miagao in the south of Iloilo inaugurated its PHP180 million, modern, solar-powered five-story building on Monday.

Mayor Richard Garin said the new building is equipped with solar panels, internet connection, alarm system, earthquake detector, and disaster risk reduction monitoring covering the whole municipality, including the barangays, among others.

“This is solar-powered. At the roofing, we have a good for 100 watts solar panel for us to save on electricity bills. We have a generator, good for 500 kVA (kilovolt-ampere). So, this building is a no-brownout building; we have solar, electric cooperative and generator,” he said in a press conference.

He said PHP140 million of the funds came from the national government, facilitated by Iloilo 1st District Rep. Janette Garin, and PHP40 million from the local government.

The fifth floor hosts the canteen and an open conference that can host up to 120 people; fourth floor is for legislative, legal office, liaison office of Congresswoman Garin, and an executive lounge; the third floor is the conference room good for 50 people; the second floor is the board room, while the ground floor hosts the assessors and treasurer’s offices.

The design maintained the facade of the old building as a sign of respect for the past administrators of the municipality.

“You bring with you the memories of the past and the learnings of the past while you are progressing towards the modern and more competitive environment,” Garin said.

She added that offices have fewer dividers and each table has the names of employees, so the transacting public can identify and see them at work. (PNA)