PRA Woos Foreigners From Europe, North America To Retire In Philippines

Nais ng Pilipinas na higit pang hikayatin ang mga banyagang retiree mula sa Europa at Hilagang Amerika na mamuhay sa bansa, sa pamamagitan ng pagtaas ng mga SRRV.

Philippine Establishes Formal Diplomatic Ties With Grenada

Pinagtibay ng Pilipinas ang pormal na ugnayan sa Grenada, ayon sa anunsyo ng DFA. Isang bagong kabanata sa pakikipag-ugnayan at kooperasyon sa mga bansa.

Peaceful Voting Reported Across Caraga, Davao Regions

Walang iniulat na kaguluhan habang naganap ang halalan sa Davao at Caraga, ayon sa mga opisyal ng eleksyon at pulis.

Iloilo City Breaks Ground For 4PH Condo Project

Iloilo City ay nagtayo ng pundasyon para sa isang condo project sa Barangay San Isidro, na bahagi ng Pambansang Pabahay Para sa Pilipino Program.

Manila Water Customers Assured Of Water Supply During Summer

Manila Water on Thursday assured its customers of continued water supply during the summer months.

Manila Water Customers Assured Of Water Supply During Summer

0
0

How do you feel about this story?

Like
Love
Haha
Wow
Sad
Angry

Manila Water on Thursday assured its customers of continued water supply during the summer months.

“With summer almost upon us and with Angat Dam about 17 meters lower than the normal high operating level of 212 meters, Manila Water continues to provide its customers of stable and reliable water supply,” Manila Water spokesperson Jeric Sevilla Jr. said in a statement.

He said Metro Manila’s East Zone concessionaire has put in place contingency and augmentation plans while working and coordinating closely with the Metropolitan Waterworks and Sewerage System (MWSS) and the National Water Resources Board (NWRB) to help ensure continuous water supply even during peak demand periods.

These contingencies include the maximization of the 100 million-liter-per-day (MLD) capacity of the Cardona Water Treatment Plant, which draws water from Laguna Lake; operation of deep wells which can provide additional 115 MLD; and operation of the 20 MLD Marikina Portable Water Treatment Plant, which can treat water from the Marikina River.

Apart from these, Sevilla said operational adjustments are also being implemented such as backwash recovery or re-treating the wastewater byproduct of the water treatment process, and water pressure management across the East Zone when needed.

Additional inflows to the La Mesa Reservoir may also be harnessed from the nearby Alat Dam, he added.

He said Manila Water continues to advocate responsible use of water with its government partners, MWSS and NWRB.

While the government and the concessionaires work together to provide the needed water supply, the public is encouraged to use water wisely and responsibly to minimize water wastage. (PNA)