PBBM Orders Continued OFW Repatriation, Speedy Aid Amid Mideast Crisis

Inatasan ni Pangulong Marcos ang patuloy na repatriation ng OFWs at agarang pagbibigay ng tulong sa gitna ng tensyon sa Middle East.

BIR-CAR Eyes Boost In Tax Collection Via ‘CHAT’, Remittances

Umaasa ang BIR-CAR na mapapalakas ang tax collection sa pamamagitan ng remittances at paggamit ng ‘CHAT’ initiatives.

National Museum Launches Archaeological Survey In Northern Samar

Naglunsad ang National Museum ng archaeological survey sa Northern Samar upang tuklasin ang kasaysayan at mga sinaunang artifact sa rehiyon.

PhilHealth Expands Access In Davao Del Norte, Launches Orthopedic Care Package

Mas pinapalawak ng PhilHealth ang access sa orthopedic care sa Davao del Norte sa pamamagitan ng bagong Z Benefits package.

MMDA, Valenzuela City Clean Up Meycauayan River

Ang MMDA at pamahalaan ng Valenzuela City ay nagtulungan sa paglilinis ng Ilog Meycauayan upang maiwasan ang pagbaha.

MMDA, Valenzuela City Clean Up Meycauayan River

1773
1773

How do you feel about this story?

Like
Love
Haha
Wow
Sad
Angry

The Metropolitan Manila Development Authority (MMDA) and the Valenzuela City government joined forces on Thursday to clean up the Meycauayan River to prevent flooding.

The cleanup, led by MMDA General Manager Procopio Lipana and Valenzuela Mayor Wes Gatchalian, is part of President Ferdinand R. Marcos Jr.’s directive after last month’s seven-hour gridlock along the North Luzon Expressway (NLEX) caused by heavy rains from tropical cyclone Crising and the southwest monsoon.

In a statement, Lipana said one backhoe, one crane, and four dump trucks were deployed for the cleanup and dredging operations.

“The cleanup is part of the Bayanihan sa Estero program of the MMDA, which was launched by President Ferdinand R. Marcos Jr. last week,” he said.

In addition, MMDA Chair Romando Artes initiated coordination with the NLEX Corp. to further discuss flood mitigation measures on the expressway.

Metro Pacific Tollways Corp. (MPTC) chief regulatory officer Arrey Perez said a detention pond, with a capacity equivalent to eight Olympic-size swimming pools, would be built to help ease severe flooding during heavy rains.

“We need to have more engineering solutions and larger infrastructure to prepare for flooding incidents,” Perez said.

At least 8,100 cubic meters of waste and water lilies, equivalent to 450 truckloads, have already been removed from a single site.

The cleanup aims to clear 6,600 cubic meters of waste.

Officials anticipate the river will be cleared within two weeks to prepare for the upcoming typhoon season. (PNA)