PBBM Highlights Philippines-China Enduring Friendship At Jones Bridge Lighting

PBBM pinagtibay ang samahan ng Pilipinas at Tsina sa pamamagitan ng ceremonial lighting ng Jones Bridge, isang simbolo ng ating hindi matitinag na pagkakaibigan.

‘Tib-Ong Bumulutho’ Boosts Literacy, Numeracy Performance In Iloilo

'Tib-Ong Bumulutho' ng SDO sa Iloilo ay nakatulong sa pag-angat ng literacy at numeracy ng mga mag-aaral mula Grade 1 hanggang sekondarya.

LPA-Affected Farmers In Davao Del Norte Get PHP5.9 Million In Inputs

Makatanggap ng PHP5.9 milyon na agricultural inputs ang mga magsasaka mula sa Davao del Norte mula sa DA-11, para sa muling pagbangon mula sa last year’s weather disturbances.

Negrense Farmers Get PHP84.96 Million Certified Rice Seeds For Wet Season

Nakatanggap ng PHP84.96 milyon na sertipikadong binhi ng bigas ang mga magsasaka sa Negros Occidental mula sa DA-PhilRice para sa wet season.

MRT-3 Logs Another Record-High Ridership With 294K Passengers

The MRT-3 is seeing a surge in ridership, surpassing the previous day's record.

MRT-3 Logs Another Record-High Ridership With 294K Passengers

3
3

How do you feel about this story?

Like
Love
Haha
Wow
Sad
Angry

The Metro Rail Transit Line 3 (MRT-3) has reached a daily ridership of 294,621 on Thursday, beating the previous day’s record of 293,290.

This is the highest since the rail service resumed operations amid the coronavirus disease 2019 (Covid-19) pandemic in June 2020.

In a Facebook post, the MRT-3 said the increase in the number of passengers may have been the result of its “Libreng Sakay (free ride)” program and its increased maximum passenger capacity through the addition of two four-car Czech CKD trains and one Chinese Dalian train, aside from 18 three-car CKD trains regularly in operation.

Each four-car train, it said, is capable of carrying up to 1,576 passengers, an increase of 394 passenger capacity from its three-car trains.

On average, it said 18 to 21 trains are running at the MRT-3 at any given time.

After the completion of the MRT-3’s rehabilitation, its trains are now running at a maximum speed of 60 kilometers per hour—reducing the time between trains to 3.5 to 4 minutes from the previous 8.5 to 9 minutes.

The MRT-3’s free ride program–meant to celebrate the completion of the MRT-3’s rehabilitation and ease the burden of rising fuel prices on the public–began on Monday and will end on April 30.

All passengers are eligible to receive the free service during all operating hours of the MRT-3.

In May 2020, right before the public transportation shutdown due to the Covid-19 pandemic, an average of 250,000 to 300,000 passengers take a ride at the MRT-3. (PNA)