President Marcos Proud, Satisfied With 2024 Economic Feats

Proud si Pangulong Marcos sa tagumpay ng ekonomiya ng Pilipinas sa 2024. Kailangan nating ipaalam ito sa ating mga kababayan.

Secretary Recto Lures Investors At WEF To Locate In Philippines With CREATE MORE

Pinasisiya ni Secretary Recto ang mga global investors na tumingin sa Pilipinas bilang makabagong sentro ng negosyo sa World Economic Forum.

Over 7.2K Security Forces To Ensure Safety Of 2025 Dinagyang Festival

Mahigit 7,200 na puwersa ng seguridad ang nakatalaga para sa kaligtasan ng Dinagyang Festival 2025. Kahalagahan ng seguridad sa kultura.

Surigao Del Norte State University Students Receive PHP1.1 Million Aid

Surigao del Norte State University ng Claver Campus, nakatanggap ng PHP1.1 milyong tulong pinansyal mula sa gobyerno. 555 estudyante ang nakinabang.

MRT-3 Posts Single-Day Record High Ridership Of 290K Passengers

A total of 293,290 passengers were served by the Metro Rail Transit Line 3 on Wednesday, a new single-day record since the rail service resumed operation amid the Covid-19 pandemic on June 1, 2020.
By The Philippine Post

MRT-3 Posts Single-Day Record High Ridership Of 290K Passengers

0
0

How do you feel about this story?

Like
Love
Haha
Wow
Sad
Angry

A total of 293,290 passengers were served by the Metro Rail Transit Line 3 (MRT-3) on Wednesday, a new single-day record since the rail service resumed operation amid the Covid-19 pandemic on June 1, 2020.

In a Facebook post, the MRT-3 attributed the increase in ridership to the current “Libreng Sakay” (free ride) program and the increased number of running trains after completing its rehabilitation under the Duterte administration.

Before the pandemic, the MRT-3 ridership ranged from 250,000 to 300,000 passengers per day.

It said that to date, around 18 three-car trains sets and two four-car train sets are running at the MRT-3 during rush hour, with the number of running trains at the MRT-3 ranging from 18 to 21 train sets at any given time.

“Ang four-car CKD train set and Dalian train set ay tumatakbo tuwing morning peak hours mula 7 a.m. hanggang 9 a.m. at afternoon peak hours mula 5 p.m. hanggang 7 p.m. (The four-car CKD train set and the Dalian train set are running during morning peak hours from 7 a.m. to 9 a.m. and afternoon peak hours from 5 p.m. to 7 p.m.),” the MRT-3 said.

In addition, MRT-3 trains are also running at increased speeds of 60 kilometers per hour since December 2020, reducing the average wait time between trains to 3.5 to 4 minutes from the previous 8.5 to 9 minutes.

With the National Capital Region and most of the country under Alert Level 1, the MRT-3 reminded passengers that some minimum public health and safety protocols remain such as no eating, no talking, and mandatory use of face masks inside its trains.

In celebration of the completion of the MRT-3’s rehabilitation and to ease the burden on commuters amidst rising fuel prices, the rail service will be free of charge to all passengers at all operating hours from March 28 until April 30. (PNA)