Senator Legarda Calls For Recognition Of Women’s Rights, Unpaid Care Work

Senador Legarda nanawagan para sa pagkilala sa mga karapatan ng kababaihan at sa hindi bayad na gawaing pambahay. Mahalaga ang kanilang kontribusyon para sa ating lipunan.

Philippines, United Kingdom Ink Framework To Facilitate More Defense, Trade Cooperation

Ang Pilipinas at United Kingdom ay pumirma ng kasunduang magpapalawak ng kooperasyon sa depensa at kalakalan. Isang hakbang patungo sa mas matatag na ugnayan.

Government Working To Ensure Stable Water Supply Ahead Of Dry Season

Ang gobyerno ay nagtatrabaho upang matiyak ang matatag na suplay ng tubig bago ang tag-init. Patuloy na minomonitor ang sitwasyon.

CCC Urges LGUs To Fully Utilize NAP, PSF To Boost Climate Resilience

Umiiral ang pagkakataon para sa mga LGUs na gamitin ang NAP at PSF sa pagpapalakas ng katatagan sa klima.

NAIA Inaugurates Improved Runway, Expanded Terminal 2

The Ninoy Aquino International Airport (NAIA) will upgrade its runway and expand its terminal 2 with over PHP900 Million budget.
By The Philippine Post

NAIA Inaugurates Improved Runway, Expanded Terminal 2

0
0

How do you feel about this story?

Like
Love
Haha
Wow
Sad
Angry

The Manila International Airport Authority (MIAA) inaugurated on Tuesday the improved runway 13/31 at the Ninoy Aquino International Airport (NAIA), as well as the expanded NAIA Terminal 2.

More than PHP400 million was spent for the runway upgrade, while over PHP500 million was allocated for the Terminal 2 expansion.

“It only took more than a year to upgrade the runway. Because of the pandemic, fewer flights, and less people, the work was finished faster,” Media Affairs Division head Jess Martinez told the Philippine News Agency.

Martinez said the overlay and rehabilitation of the runway included putting of cement, as asphalt was previously used for the runway. The additional taxiway was also opened.

A taxiway would save time in terms of aircraft movements per hour because the aircraft would not need to wait or traverse the whole length of the runway, and just take the taxiway to exit, he noted.

All domestic and international flights could use this taxiway, although limited to the Airbus A321 and below types of aircraft, Martinez said.

He also pointed out that runway overlays should be done every three to four years.

With the recent upgrade, the next repair or upgrading maybe after six years, he said.

Meanwhile, an additional 2,800 square meters was used for the expansion of NAIA Terminal 2.

The expansion was mainly for the arrival and conveyor area, lobby, and check-in in the departure area. (PNA)