President Marcos Proud, Satisfied With 2024 Economic Feats

Proud si Pangulong Marcos sa tagumpay ng ekonomiya ng Pilipinas sa 2024. Kailangan nating ipaalam ito sa ating mga kababayan.

Secretary Recto Lures Investors At WEF To Locate In Philippines With CREATE MORE

Pinasisiya ni Secretary Recto ang mga global investors na tumingin sa Pilipinas bilang makabagong sentro ng negosyo sa World Economic Forum.

Over 7.2K Security Forces To Ensure Safety Of 2025 Dinagyang Festival

Mahigit 7,200 na puwersa ng seguridad ang nakatalaga para sa kaligtasan ng Dinagyang Festival 2025. Kahalagahan ng seguridad sa kultura.

Surigao Del Norte State University Students Receive PHP1.1 Million Aid

Surigao del Norte State University ng Claver Campus, nakatanggap ng PHP1.1 milyong tulong pinansyal mula sa gobyerno. 555 estudyante ang nakinabang.

NAIA Inaugurates Improved Runway, Expanded Terminal 2

The Ninoy Aquino International Airport (NAIA) will upgrade its runway and expand its terminal 2 with over PHP900 Million budget.
By The Philippine Post

NAIA Inaugurates Improved Runway, Expanded Terminal 2

0
0

How do you feel about this story?

Like
Love
Haha
Wow
Sad
Angry

The Manila International Airport Authority (MIAA) inaugurated on Tuesday the improved runway 13/31 at the Ninoy Aquino International Airport (NAIA), as well as the expanded NAIA Terminal 2.

More than PHP400 million was spent for the runway upgrade, while over PHP500 million was allocated for the Terminal 2 expansion.

“It only took more than a year to upgrade the runway. Because of the pandemic, fewer flights, and less people, the work was finished faster,” Media Affairs Division head Jess Martinez told the Philippine News Agency.

Martinez said the overlay and rehabilitation of the runway included putting of cement, as asphalt was previously used for the runway. The additional taxiway was also opened.

A taxiway would save time in terms of aircraft movements per hour because the aircraft would not need to wait or traverse the whole length of the runway, and just take the taxiway to exit, he noted.

All domestic and international flights could use this taxiway, although limited to the Airbus A321 and below types of aircraft, Martinez said.

He also pointed out that runway overlays should be done every three to four years.

With the recent upgrade, the next repair or upgrading maybe after six years, he said.

Meanwhile, an additional 2,800 square meters was used for the expansion of NAIA Terminal 2.

The expansion was mainly for the arrival and conveyor area, lobby, and check-in in the departure area. (PNA)