Antimicrobial Resistance Awareness Drive Up In Caraga

Layunin ng kampanya na paalalahanan ang publiko sa tamang paggamit ng antibiotics at iba pang gamot.

Japan Allots Yen1.7 Billion For Rice Processing System In Isabela

Layunin ng proyekto na mapabuti ang post-harvest facilities at mapataas ang kalidad ng bigas sa rehiyon.

UP Manila, DepEd Partner For Mental Health Literacy In Schools

Layunin ng kasunduan na palakasin ang kaalaman ng mga guro at mag-aaral tungkol sa mental health awareness.

Antique To Prioritize GIDA Teachers, Students In Aid Grant

Layunin ng programa na matulungan ang mga nasa liblib na lugar na magkaroon ng pantay na oportunidad sa edukasyon.

PEZA: PBBM Approves 4 Ecozones In First Half Of 2025

Apat na ecozones na ang naaprubahan ni PBBM. Nakatutok ang PEZA sa sustainable na pag-unlad sa unang kalahati ng 2025.

PEZA: PBBM Approves 4 Ecozones In First Half Of 2025

903
903

How do you feel about this story?

Like
Love
Haha
Wow
Sad
Angry

The Philippine Economic Zone Authority (PEZA) said President Ferdinand R. Marcos Jr. already approved four ecozones in the first half of the year.

In a statement, PEZA said these include two expansions of a manufacturing zone in Batangas and two new Information Technology (IT) Parks in Tagbilaran City and Bacolod City.

On May 21, Marcos issued Proclamation 910, designating 23.49 hectares of land located in Barangays Bagong Pook and Luta Sur, Malvar, Batangas to be included in the existing Lima Technology Center (LTC).

More than PHP980 million will be invested in the development of the area, which is expected to be completed by June 2027.

Another expansion area for LTC was also approved by the Office of the President in March under Proclamation 846, adding 19.23 hectares to the ecozone.

On June 2, the President also signed Proclamation 919, which designates 33.96 hectares of land in Barangay 41, Bacolod City as an IT Park to be called The Upper East.

The IT Park, to be operated by Megaworld, is projected to attract more than PHP1 billion in investments for the construction of two IT buildings.

PEZA said five IT-BPO companies are expected to operate in the park, creating more than 2,500 local jobs.

PEZA also formalized the proclamation of Tagbilaran Uptown IT Hub 2 as an IT Park in Bohol with the signing of its registration agreement on May 8.

The President signed Proclamation 821 designating three parcels of land in Dampas, Tagbilaran City with an area of about 11,237 square meters as an IT Park.

With a projected investment of more than PHP200 million, the expansion aims to generate additional jobs and attract more IT-business process management locators.

PEZA said that under the Marcos administration, 32 ecozones have already been proclaimed, bringing in PHP13.406 billion in committed investments.

“As a medium-term strategy under the Philippine Development Plan, the ecozones will play a vital role in attracting the much-needed investments in the country, generating more jobs for Filipinos, and contributing in accelerating the nation’s socio-economic progress,” PEZA Director General Tereso Panga said. (PNA)