TXT Hyperfocus: A Multi-Sensory Concert Experience That Puts MOAs In The Action

Don’t miss out on TXT’s groundbreaking 4DX concert film “Tomorrow X Together: Hyperfocus,” coming to Ayala Malls Cinemas from January 15 to 21, where fans will feel every beat.

PBBM To DA: Ensure Swift Support For Farmers On Planting Season

President Ferdinand R. Marcos Jr. nag-utos sa DA na bilisan ang suporta sa mga magsasaka ngayong panahon ng pagtatanim.

LITAW Immediate Disaster Response Program Set For January Launch

Ang LITAW, isang bagong programa, ay naglalayong magbigay ng agarang tulong sa mga pamilyang naapektuhan ng mga natural na kalamidad, ilulunsad sa Enero.

Philippine Calls For Energy Transition Support From Oil-Producing Countries

Kinukuha ng Pilipinas ang suporta ng mga bansang nagpoprodyus ng langis para sa makatarungan na paglipat sa renewable energy sa harap ng mga hamon ng pagbabago ng klima.

DPWH On Track With Key Calabarzon Infra Projects

Ang DPWH sa Calabarzon ay patuloy sa pagpapatupad ng mga proyekto upang gawing mas magaan ang trapiko at mapabuti ang access sa kalsada papunta sa iba't ibang bahagi ng rehiyon.
By The Philippine Post

DPWH On Track With Key Calabarzon Infra Projects

2274
2274

How do you feel about this story?

Like
Love
Haha
Wow
Sad
Angry

The Department of Public Works and Highways (DPWH) in Region 4A (Calabarzon) is on track with projects aimed at easing traffic congestion and enhancing road access to various parts of the region under the Marcos administration’s Build Better More program.

During the “Kapihan sa Bagong Pilipinas” media forum, DPWH-4A Regional Director Jovel Mendoza said the rehabilitation of the portion of Maharlika Highway within their jurisdiction, which spans 231 kilometers from Calamba City to Tagkawayan in Quezon, is being diligently pursued by the incumbent administration.

“Maharlika Highway is the major thoroughfare of motorists (travelling) from Calamba City to Tagkawayan, Quezon in the region… linking Bicol up to Visayas and Mindanao,” he told reporters during the forum that took place at the DPWH regional office in this city.

The DPWH official did not specify the target completion date of the highway rehabilitation project but called it “a top priority.”

President Ferdinand R. Marcos Jr. last week said the reconstruction of this key highway has been ongoing for 12 years, but this is the only government that has put serious attention to its completion.

“All those rehabilitations, you know, we only really started two years ago. Because nothing was done in the previous administration, nothing was done in the administration before that,” Marcos said about his administration’s infrastructure initiatives.

Meanwhile, Mendoza also underscored the significance of the South Luzon Expressway TR4, a 48-kilometer bypass road from Santo Tomas in Batangas to Lucena City, Quezon, which is envisioned to alleviate congestion in San Pablo City.

This ongoing infrastructure project is intended to significantly reduce travel time in the region from four hours to one hour, making it a more convenient alternative to the congested Daang Maharlika.

Barring any unforeseen delays, the road is expected to be partially passable by 2025.

In Cavite, Mendoza said the 40-kilometer East Lateral Road from Aguinaldo Highway to Nasugbu, Batangas, once complete, will ease traffic in Tagaytay City, particularly on weekends when tourist traffic peaks.

Additionally, the flyover in Mendez town, Cavite, is expected to alleviate congestion at the Mendez junction leading to Nasugbu, Batangas.

Mendoza also highlighted the construction of a 1.42-kilometer bridge linking Lopez in the mainland to Perez in Alabat Island, providing a faster alternative to boat or barge travel.

“This locally funded project enhances connectivity to remote areas,” Mendoza said. (PNA)